Quality control and inspection activities at the 1AK-LI-ION assembly plant:
- Sorting of elements within one batch — using cells from one batch with the minimum possible variation in parameters in each individual battery.
- Double tightening of bolted connections with torque wrenches with application of control marks.
- Control of correct connection of the BMS system to the cells, control of cell parameters after assembly, active balancing (gross balance) with specialized devices.
- Output control of battery parameters in the form of 3-10 charge-discharge cycles at maximum operating modes (hourly discharge, two-hour charge) with control of actual capacity, temperature of units (using a thermal imager).